Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/11/2020 | STORMWATER INSTALL OF CONTROLS | Approved | SITE HAS BEEN APPROVED AT THIS TIME SINCE THE OWNERSHIP HAS CHANGED AND ALL OUTSTANDING WORK HAS BEEN COMPLETED | |
| 09/15/2010 | STORMWATER INSTALL OF CONTROLS | Correction Required | SILT BUILD-UP IN BASIN NEEDS TO BE ADDRESSED BEFORE FINAL CO | |
| 07/19/2010 | STORMWATER INSTALL OF CONTROLS | Approved | CHECK STORMWATER CONTROLS AFTER RAINEVENT OF 7/18/10. CONTROLS ARE WORKING PROPERY. CONTRACTOR HAS REINSTALLED WATTLE ALONG THE PERIMETER OF THE PROPERTY. CONSTRUCTION ENTRANCE SHOULD BE RESTABILIZED. AREA INDICATED ON PLAN AS BASIN DRIVE IN SERVICE AREA IS EXPERIENCING SOME EROSION AND SHOULD BE ADDRESSED. |