Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date |
Description |
Inspector |
Results |
Comments |
| 05/11/2020 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
SITE HAS BEEN APPROVED AT THIS TIME SINCE THE OWNERSHIP HAS CHANGED AND ALL OUTSTANDING WORK HAS BEEN COMPLETED |
| 07/07/2011 |
ENGINEERING PRE-CONSTRUCTION |
|
Continued |
NO ACTIVITY. |
| 06/07/2011 |
ENGINEERING PRE-CONSTRUCTION |
|
Continued |
NO ACTIVITY. |
| 05/24/2011 |
ENGINEERING PRE-CONSTRUCTION |
|
Continued |
NO ATIVITY AT THIS TIME. |
| 05/04/2011 |
ENGINEERING PRE-CONSTRUCTION |
|
Continued |
NO ACIVITY. |
| 03/30/2011 |
ENGINEERING PRE-CONSTRUCTION |
|
Continued |
NO ACTIVITY. |
| 10/06/2009 |
ENGINEERING PRE-CONSTRUCTION |
|
Approved |
MET WITH OWNER/DEVELOPER CLYDE NELSON (270-1227). DISCUSSED SWWPP ADDRESSED CONCERNS REGARDING ASSURANCE AND DRAINAGE ISSUES. |