Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 06/17/2009 |
GRADING - INTERMEDIATE |
|
Approved |
|
| 02/02/2009 |
GRADING - INTERMEDIATE |
|
Partial Approval |
Contractor working on bridge. |
| 01/08/2009 |
GRADING - INTERMEDIATE |
|
Partial Approval |
Donny asked me to shot the slopes on existing H.C. ramp on the northeast corner of project. Ramp is out of complaince (11.3%) I explained to Donny if he want to remove it he need to talk to the right-a-way inspector. H.C. ramp is in right-a-way. |
| 01/07/2009 |
GRADING - INTERMEDIATE |
|
Partial Approval |
Met with Donny in regards to monuments near and half way in the right-a-way. I told Donny it was ok for the right-a-way inspector to look at them since he was already there. |
| 12/15/2008 |
GRADING - INTERMEDIATE |
|
Correction Required |
Met on site with Donny. Donny said he was to busy to shoot grades. I told Donny for any more inspections he will need to call them in through the IVR system. |
| 12/12/2008 |
GRADING - INTERMEDIATE |
|
Correction Required |
Met Donny on site. Donny said he was to busy to shoot grades. So re-scheduled for Monday. |