Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date |
Description |
Inspector |
Results |
Comments |
| 10/02/2009 |
STORMWATER FOLLOW-UP INSP |
|
Approved |
CHECKED SITE PER REQUEST OF SITE SUPER. JERRY. VERIFIED LAYOUT FOR TRASH ENCLOSURE AND STORM PIPE. |
| 09/03/2009 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
NEED TO ADDRESS TRACKOUT SITUATION ON IRVINGTON |
| 08/27/2009 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
SPOKE WITH JERRY. INSTRUCTED HIM THAT STORMWATER CONTROLS AND CONSTRUCTION ENTRANCE NEEDED TO BE IN PLACE BY EARLY NEXT WEEK. ALSO TRACK OUT ON TO IRVINGTON NEEDS TO BE ADDRESSED. |
| 08/26/2009 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
CONSTRUCTION ENTRANCE AND STORMWATER CONTROLS NEED TO BE PUT IN PLACE. |