Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T08BU01925
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/29/2009 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
12/23/2009 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | PARTIAL APPROVAL GIVEN FOR STOCKING PURPOSES. REMAINING PUNCH LIST ITEMS STILL NEED TO BE ADDRESSED, ALONG WITH SLOW PERKING BASIN ON E/S OF BUILDING. | |
12/10/2009 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | SPOKE WITH CONTRACTOR. MISTAKENLY CALLED IN FINAL INSPECTION. INSPECTION INTENDED FOR RIGHT-OF-WAY INSPECTOR. | |
12/09/2009 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | PRELIMINARY PUNCH LIST. Address: 2345 E. Irvington Rd Permit #: T08BU01925 Contractor: Jerry Jerry1@haworthcorp.com Preliminary Punch List The following is a preliminary list of items that need to be addressed prior to site completion. This list was requested by the contractor prior to final inspection. Due to on-going construction not all inspections were possible. As construction nears completion the contractor will call for a final inspection to address outstanding items. Contractor needs to complete all site work per approved plan. 1) Compete basin structure on S/E corner of property per approved plan and in accordance with standards. 2) Clean basin structure on the east side of building so that outlet pipe is clear of debris and basin is draining properly. Certified letter from engineer is necessary for all basins/drainage structures on the property. 3) H/C parking on south-side of building needs to be verified @ 2%, unable to verify at time of inspection due to placement of construction materials. 4) Ensure that all sidewalk scuppers are cleared of dirt and debris 5) Remove all construction debris 6) Stabilize all areas disturbed by construction, 7) Complete all landscaping items. 8) Complete necessary striping per approved plan 9) Install bicycle parking per approved plan 10) Remove stormwater controls from site 11) Per note 27 complete installation of air compressor and bollard 12) Per note 32 complete the access ramp to basin 13) Provide as-builts where necessary Please call if you have any questions or need clarification. M. Carreon 240-9971 |
|
08/18/2009 | ENGINEERING PRE-CONSTRUCTION | Approved | MET WITH JERRY (602)332-5023 ON SITE. DISCUSS HIS SWPPP, WILL BE INSTALLING CONTROLS LATER THIS WEEK. BLDG. COMPLETION DATE SET FOR DEC. 24TH. |