Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T08BU01907
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/23/2010 | STORMWATER FOLLOW-UP INSP | Approved | ||
03/25/2010 | STORMWATER FOLLOW-UP INSP | Continued | CONTRACTOR NEEDS TO ADDRESS TRACKING FROM NON-PAVED SIDE OF SITE TO PAVED SIDE. ONE HALF OF SITE WILL BE OCCUPIED WITH A FENCE DIVIDING CONSTRUCTION FROM PUBLIC, THIS MUST BE MAINTAINED THROUGHOUT CONSTRUCTION NO OTHER SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
03/10/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME | |
03/01/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
02/17/2010 | STORMWATER FOLLOW-UP INSP | Continued | CONTRACTOR WILL WANT C OF O FOR NORTH BLDG FIRST. SIDEWALK, CURBING AND TRASH ENCLOSURE INSTALLED. NORTH RETAINING WALL COMPLETED. CONCERNS ABOUT BIKE PARKING TYPE AND LOCATIONS. SITE NOT PAVED YET. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
01/12/2010 | STORMWATER FOLLOW-UP INSP | Continued | SOME CURBING, AND SIDE WALK INSTALLED ALONG BLDG TO NORTH. NO OTHER SITE WORK COMPLETED. SIGNIFICANT GRADE CHANGES THROUGHOUT THE PROJECT, WILL INSPECT FOR COMPLIANCE. NO STORM WATER CONCERNS AT THIS TIME |
|
01/06/2010 | STORMWATER FOLLOW-UP INSP | Continued | CONTRACTOR WORKING ON SOME SITE WORK, MOSTLY COMPLETING BLGD CONSTRUCTION. NO STORM WATER CONCERNS AT THIS TIME |
|
10/02/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS AT THIS TIME. CONTINUE TO SWEEP UP ADJACENT ROADWAYS AND DOCUMENT SELF INSPECTIONS. | |
08/14/2009 | STORMWATER FOLLOW-UP INSP | Continued | 1) REPLACE OR RE-ESTABLISH SEDIMENT CONTROLS THAT HAVE FILLED-IN OR LOST MORE THAT 50% OF THIER EFFECTIVENESS (SOUTH END OF SITE). 2) ADD SUPPLEMENTAL CONTROLS ALONG THE EAST/SE PERIMETER OF THE SITE WHERE THE GRADE ON SITE IS HIGHER THAN OFF SITE. 3) BRING ANY SPOILS FROM TRENCHING BACK ONTO SITE |
|
06/11/2009 | STORMWATER FOLLOW-UP INSP | Continued | STORM WATER ITEMS LISTED ON PREVIOUS INSPECTION HAVE BEEN ADDRESSED. CONCRETE/MATERIALS WASH OUT HAS BEEN INSTALLED. NO OTHER SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |
|
06/01/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) RE-ESTABLISH YOUR CONSTRUCTION ENTRANCE 2) SWEEP UP TRACKED SOIL 3) ENSURE PERIMETER SEDIMENT CONTROLS ARE AT THE PERIMETER - AND ARE NOT COVERED WITH FILL DIRT 4) POST A SIGNED COPY OF YOUR NOI AT ENTRANCE |