Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/08/2009 | STORMWATER INSTALL OF CONTROLS | Approved | 1) PERIMETER SEDIMENT CONTROLS HAVE BEEN INSTALLED PER SWPPP AND AGREEMENT MADE AT PRECON. 2) REPAIR AND MAINTAIN CONTROLS AS NECESSARY AND WHEN NEEDED, DOCUMENT INSPECTIONS. 3) INSTALL CONCRETE/MATERIALS WASH OUT WHEN NEEDED. 4) SWEEP UP TRACKING ROUTINELY. |