Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2009 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) INSTALL SEDIMENT CONTROLS @ PERIMETER PER PLAN/PER PRE-CON MEETING. 2) INSTALL STABILIZED CONSTRUCTION ENTRANCE/ENTRANCES PER PLAN. 3) INSTALL CONCRETE/MATERIALS WASH-OUT AS SOON AS PRACTICABLE. 4) SWEEP UP TRACKED MATERIAL OFF OF PUBLIC ROADWAYS ROUTINELY. 5) MAINTAIN SEDIEMNT CONTROLS THROUGHOUT THE PROJECT AND INSPECT PER PLAN. 6) POST A SIGNED COPY OF YOUR NOI ON SITE. CALL FOR RE-INSPECTION WHEN SEDIMENT CONTROLS HAVE BEEN INSTALLED. |