Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T08BU01781
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/24/2010 | GRADING - INTERMEDIATE | Approved | Received EOR cert for storm system, see punch list under final for remaining items. | |
| 03/17/2010 | GRADING - INTERMEDIATE | Continued | Landscaping finishing up, all site work complete. Need revised as-builts to reflect changes made to plan. | |
| 03/12/2010 | GRADING - INTERMEDIATE | Continued | Preliminary grading inspection, need to get as-builts, eng. cert for strom drainage, finish stripping, and LS, remove all construction debris. | |
| 03/05/2010 | GRADING - INTERMEDIATE | Continued | Checked slope between sidewalk and water harvest basin along 29th. Slope is 3:1 and OK | |
| 03/04/2010 | GRADING - INTERMEDIATE | Partial Approval | Discussed water harvest areas along Craycroft and west edge of building. Contractor will provide postive drainage from water harvest to outlet pipe along Craycroft. It appears that outlet structure is to high at west edge of property and water may flow onto neighbors property before entering structure. Contractor will contact EOR and lower if needed. | |
| 03/01/2010 | GRADING - INTERMEDIATE | Partial Approval | Met with contractor to review sidewalk at front of building and connection to ROW. SW will maintain 2% slope along access route then transition to ROW. | |
| 02/16/2010 | GRADING - INTERMEDIATE | Partial Approval | reviewed location for access ramp at rear of building, also discussed cleaning all storm drains and MH prior to final. Building expected to be finished in 3 weeks. | |
| 02/01/2010 | GRADING - INTERMEDIATE | Continued | Conc paving underway, building under const. No problems at this time. | |
| 01/20/2010 | GRADING - INTERMEDIATE | Continued | working on parking lot and site. | |
| 01/07/2010 | GRADING - INTERMEDIATE | Partial Approval | Inspected conc. collors at storm pipe connection to existing pipe, also inspected base for storm MH. both OK |
|
| 01/06/2010 | GRADING - INTERMEDIATE | Partial Approval | Contractor made connect of RCP storm pipe to existing city storm pipe onsite. Also has base for storm CB formed and ready to pour. | |
| 01/04/2010 | GRADING - INTERMEDIATE | Partial Approval | Contractor making tie in at existing strom sewer, checked approved plans to insure tie is per plan and it is. Told contractor I would like to inspect prior to backfill. | |
| 12/07/2009 | GRADING - INTERMEDIATE | Continued | Installing downspout lines under canopy, bldg to inspect to point of connection with storm line. | |
| 11/24/2009 | GRADING - INTERMEDIATE | Continued | Contractor working on Bldg, and canopy, driveway approach on Craycroft is formed and ready to pour. | |
| 11/17/2009 | GRADING - INTERMEDIATE | Continued | Site work underway with canopy and building. | |
| 11/02/2009 | GRADING - INTERMEDIATE | Continued | Contractor working on underground tanks, screen wall on north side of property, removing sidewalk along craycroft. | |
| 10/14/2009 | GRADING - INTERMEDIATE | Continued | Contractor has begun work onsite, stopped by and informed that they need to call for Pre-con, they will do that this week. |