Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date |
Description |
Inspector |
Results |
Comments |
| 03/24/2010 |
STORMWATER FOLLOW-UP INSP |
|
Approved |
Site stabilized, all controls removed |
| 03/17/2010 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Landscape groung cover installed, controls can be taken down. |
| 03/04/2010 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
minor tract out onto 29th street. |
| 03/03/2010 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Controls in good shape |
| 02/16/2010 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Storm controls OK |
| 01/20/2010 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
watch for track out after rain event. |
| 01/04/2010 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Storm controls OK |
| 11/24/2009 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
CLean street as needed for track out |
| 11/17/2009 |
STORMWATER FOLLOW-UP INSP |
|
Continued |
Controls are OK |
| 11/02/2009 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Contrctor moved construction entrance to the west side of property, all controls in place. |