Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - TIER REV
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/11/2010 | GRADING - TIER REV | Approved | ||
| 10/29/2009 | GRADING - TIER REV | Continued | NSPECT INSTALLATION OF CONCRETE AREA DRAINS ALONG STORM DRAINAGE SYSTEM. LAUREN W/ ENG APPROVED CHANGE FROM PLASTIC TO CONCRETE DRAINS, WILL GET COPY OF EOR APPROVAL AND COT APPROVAL FOR CHANGE |
|
| 10/27/2009 | GRADING - TIER REV | Continued | TALKED W/ SUPER ON CHANGE FROM PLASTIC CATCH BASINS SHOWN ON APPROVED PLANS TO CONCRETE CATCH BASINS. CONTRACTOR WILL PROVIDE APPROVAL FROM EOR AND COT. |