Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T08BU01755
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/10/2010 | STORMWATER FOLLOW-UP INSP | Approved | ||
07/19/2010 | STORMWATER FOLLOW-UP INSP | Continued | CONTRACTOR HAS A TEMP USE PERMIT TO OCCUPY THE ADJOINING PROPERTY TO THE SOUTH DURING CONSTRUCTION, THIS PARCEL MUST BE STABILIZED IN ACCORDANCE WITH THE GRADING ORDINANCE PRIOR TO FINAL APPROVALS. NO STORM WATER CONCERNS AT THIS TIME. CONTRACTOR STATED THAT THE SITE WILL BE COMPLETED WITHIN TWO WEEKS. |
|
06/01/2010 | STORMWATER FOLLOW-UP INSP | Continued | 1) CONTRACTOR MOVED CONSTRUCTION ENTRACE, SITE STILL NOT PAVED. 2) SOME SIDEWALKS AND CURBING COMPLETED, SCUPPERS BEING INSTALLED. 3) CONTRACTOR NEEDS TO CLEAN OUT STORM DRAINAGE SYSTEM AND PROTECT ALL INLETS AND CATCH BASINS FROM SOIL AND CONST DEBRIS. 4) CONTRACTOR NEEDS TO CLEAN UP MATERIALS DUMPED ON SITE ( PAINT, STUCCO...). COTRACTOR MAY NEED TO SUBSTITUTE SOME TREES SHOWN ON LANDSCAPE PLAN DUE TO THE FACT THAT THEY ARE TOO CLOSE TO THE BLDG. MAY NEED REVISED PLAN. |
|
04/07/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. NO SITE WORK HAS BEEN COMPLETED, CONTRACTOR STATED HE WILL CALL IN AN INSPECTION WHEN SUB FOR SITE WORK HAS STARTED. |
|
03/19/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
03/10/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME | |
02/17/2010 | STORMWATER FOLLOW-UP INSP | Continued | NORTH PERIMETER WALL HAS BEEN INSTALLED W/ WALL OPENINGS. UNDERGROND DRAINAGE W/ BUBBLER HAS BEEN INSTALL, NO OTHER SITE WORK COMPLETED. NO STORM WATER CONCERNS AT THIS TIME |
|
01/06/2010 | STORMWATER FOLLOW-UP INSP | Continued | WORK BEING DONE ON BLDGS, SOME SITE WORK COMPLETED LIKE BACK WALL W/ WALL OPENINGS AND SOME CURBING. STORM WATER DRAINAGE BUBBLER HAS BEEN COVERED TO PROTECT IT FROM SOIL. NO OTHER SIGNIFICANT STORM WATER CONCERNS |
|
12/29/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT THE PROJECT. | |
11/03/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
10/29/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS AT THIS TIME | |
10/23/2009 | STORMWATER FOLLOW-UP INSP | Continued | CONTRACTOR INSTALLED APPROX. 200' OF 18" HDPE STORM DRAIN PIPE W 6 AND 8" INLET "T" SECTIONS FOR ROOF LEADERS AND AREA DRAINS. PIPE TRENCH WAS BEDDED, GRADED TO DRAIN AND COMPACTED. TERMINATION POINT IS A BUBBLER BOX INTO A RET/DET BASIN. PROVIDE ENG OF RECORD APPROVAL OF CHANGE FROM CATCH BASIN SHOWN ON GRADING PLAN TO PROPOSED CONCRETE CATCH BASINS - CALL FOR INSPECTION PRIOR TO COVER OF CATCH BASIN/PIPE CONNECTIONS. ITEMS LISTED ON PREVIOUS INSPECTION HAVE BEEN ADDRESSED. CONTINUE TO MAINTAIN, INSPECT, AND REPLACE SEDIMENT CONTROLS THROUGHOUT THE DURATION OF THE PROJECT PER YOUR STORM WATER PLAN. |