Inspection History Details
Inspection Status: Denied
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/25/2010 | GRADING - FINAL | Denied | NO CHANGES, SPOKE W/ PIMA PAVING, BUILD PER APPROVED PLAN OR PROVIDE AN APPROVED PLAN THAT SHOWS CHANGES MADE. | |
| 01/21/2010 | GRADING - FINAL | Denied | NO CONTACT - NO ONE ON SITE | |
| 11/16/2009 | GRADING - FINAL | Denied | 1) HC PARKING DOES NOT MEET ADAAG/ANSI REQ: a) SLOPES NO >2% IN ANY DIRECTION b) HC SURFACE MUST BE FIRM AND SLIP RESISTANT c) INSTALL TRUNCATED DOMES AT ALL HC PARKING LOADING/UNLOADING AREAS. 2) INSTALL 6"x 6" EXTRUDED CURB (SEE NOTE #15) AS SHOWN ON PLANS 3) PROVIDE MANUFACTURES SPECS ON SOIL AMENDMENT USED. 4) PROVIDE STRIPING AT PARKING SPACES 9' APART AS SHOWN ON PLANS |
|
| 09/16/2009 | GRADING - FINAL | Correction Required | INSPECTED SITE COMPARED TO THE APPROVED GRADING PLAN, NO SIGNIFICANT DISCEPANCIES FOUND. CONTRACTOR DID NOT CALL IN ANY INSPECTIONS PRIOR TO, DURING OR AT END OF CONSTRUCTION FOR FINAL APPROVAL. THE SITE WAS ALSO UNDER A STORM WATER PERMIT AND PLAN THAT WAS NOT INSPECTED FOR COMPLIANCE. |