Inspection History Details
Inspection Status: Continued
Inspection History: STORMWATER FINAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/04/2009 | STORMWATER FINAL INSPECTION | Continued | 1) HC PARKING DOES NOT MEET ADAAG/ANSI REQ: a) SLOPES NO >2% IN ANY DIRECTION b) HC SURFACE MUST BE FIRM AND SLIP RESISTANT c) INSTALL TRUNCATED DOMES AT ALL HC PARKING LOADING/UNLOADING AREAS. 2) INSTALL 6"x 6" EXTRUDED CURB (SEE NOTE #15) AS SHOWN ON PLANS 3) PROVIDE MANUFACTURES SPECS ON SOIL AMENDMENT USED. 4) PROVIDE STRIPING AT PARKING SPACES 9' APART AS SHOWN ON PLANS |
|
| 12/04/2009 | STORMWATER FINAL INSPECTION | Continued | CALLED IN FOR FINAL GRADING, NO CONTACT ON SITE. OWNER/CONTRACTOR HAS NOT PROVIDED A STORM WATER PLAN FOR CONSTRUCTION AND AN APPROVED GRADING PLAN. SITE IS OCCUPIED |