Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2009 | FIRE SPKLR - FINAL | Approved | ||
| 08/27/2008 | FIRE SPKLR - FINAL | Denied | 1. Wrong temp. sprinkler head in stairwell basement need to change 212 to a 155 deg. Sidewall head. 2. Need to add detector in preaction system 3. Replace missing ceiling tile in the doorway and room called education place, also add sprinkler head in doorway entry per approved plans. |