Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T08BU01469
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/15/2009 | GRADING - FINAL | Approved | Received as-builts all hydro seeding complete, project approved. | |
09/08/2009 | GRADING - FINAL | Partial Approval | Stopped by site today to talk to super and find out how the as-builts are comming along, also they still have office trailer on site. | |
07/29/2009 | GRADING - FINAL | Partial Approval | Complete item 2 & 3 from punch list. | |
07/21/2009 | GRADING - FINAL | Denied | Complete items 1,2,3,4,11 from previous punch list. | |
07/01/2009 | GRADING - FINAL | Denied | Complete the following items prior to final. 1) Stabilize all distrubed areas, and remove all temp erosion controls after stabilization. 2) Provide as-builts and eng. cert for drainage. 3) Remove all const. debris and storage trailers. Sht C-2 4) grade to drain S/W scuppers behind bldg C1 & C2 5) Expose end of 12" bleeder pipe @ ring road. 6) As-built S/W changes in court yard. Sht C-3 7) Install truncated domes at HC parking 8) Grade to drain storm water at scupper to water harvest area. 9) Provide as-built for S/W revisions and drainage. 10) install basin outlet per detail Y/C3 or as-built. 11) compact DG trail per detail V /C6 Sht C-4 12) show 12" HDPE pipe north of Bldg 3 13) sHOW 2-24" hdpe instead of 1-30" pipe. 14) trim 24" HDPE pipe per detail AD sht C9 15) check grouted rip rap on slope per detail AD sht C9 Call for re-inspection |