Permit: T08BU01469

Parcel: 14101008C


Addresses:

10770 E BILBY RD


Inspection Status: Approved

Inspection History: ENGINEERING PRE-CONSTRUCTION

Permit Number - T08BU01469

Inspection Description - ENGINEERING PRE-CONSTRUCTION

Inspection Status - Approved

Date Description Inspector Results Comments
02/11/2009 ENGINEERING PRE-CONSTRUCTION Approved DIVERSIFIED CONSTRUCTION AZPDES AUTHORIZATION RECEIVED.
02/05/2009 ENGINEERING PRE-CONSTRUCTION Correction Required CORRECTION NOTICE WILL BE CLOSED OUT WHEN AZPDES AUTHORIZATION FOR DIVERSIFIED CONSTRUCTION IS RECEIVED.
01/28/2009 ENGINEERING PRE-CONSTRUCTION Correction Required SOME COMPLIANCE HAS BEEN ACHIEVED. FOLLOW-UP INSPECTION SCHEDULED FOR 02-05-09.
PLEASE COMPLETE ALL PUNCH LIST ITEMS.

1. PROVIDE A N.O.I. AND AZPDES AUTHORIZATION FOR GENERAL CONTRACTOR "DIVERSIFIED DESIGN AND CONSTRUCTION" AND POST IT ON SITE. (PER LETTER DATED JULY 30, 2008 FROM RICK ENGINEERING BRUCE HUYNH) INSERT IN SWPPP APPENDIX "A", AND PROVIDE C.O.T. A COPY.
2. INSERT COPIES OF N.O.I. FOR ALL OPERATORS AT THIS SITE IN APPENDIX "A".
3. ATTACH CONTRACTOR AND SUBCONTRACTOR CERTIFICATIONS IN APPENDIX "B".
4. INSERT CONSTRUCTION SCHEDULE IN APPENDIX "E".
5. INSERT INSPECTIONS IN TO THE SWPPP BOOK
6. COMPLETE SWPPP DOCUMENTATION.
.
01/21/2009 ENGINEERING PRE-CONSTRUCTION Correction Required CORRECTION NOTICE ISSUED TO RICHARD KIN FOR COMPLIANCE WITHIN 7 DAYS OR A NOTICE OF VIOLATION WILL BE ISSUED. RE-INSPECTION ON 01-28-09
1. COMPLETE PRE-CON DOCUMENT AND PROVIDE A COP TO THE INSPECTOR.
2. REVIEW PRE-CON DOCUMENT AND SWPPP.
3. FILL IN ALL PERTINENT INFORMATION ON THE SWPPP.
4. COMPLETE ALL ITEMS IN LETTER FROM BRUCE HUYNH TO AL FLORES DATED 7-30-08
5. PROVIDE READABLE INSPECTION FORM CONSISTENT WITH THE SWPPP FOR THIS PROJECT.