Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Date Description Inspector Results Comments
12/13/2010 GRADING - INTERMEDIATE Approved
06/28/2010 GRADING - INTERMEDIATE Violation CONTRACTOR DID NOT CALL IN A PRE-CONSTRUCTION INSPECTION FOR THERE GRADING PERMIT PROR TO THE START OF CONSTRUCTION. SITE IS 70% COMPLETED. SITE IS IN NON-COMPLIANCE WITH THERE STORM WATER PLAN AND PERMIT, NO SEDIMENT CONTROLS HAVE BEEN INSTALLED.

CORRECTION REQUIRED:
1) INSTALL APPROVED SEDIMENT CONTROLS PER YOUR STORM WATER PLAN.
2) MAINTAIN SEDIMENT CONTROLS UNTIL THE SITE IS PAVED.
3) PROVIDE A DESIGNATED CONCRETE/MATERIALS WASH OUT ON SITE.
4) PERFORM PERIODIC STORM WATER MAINTENANCE SELF INSPECTION PER YOUR PLAN AND DOCUMENT THEM.
5) SWEEP UP TRACKING OF SOIL FROM YOUR SITE OFF OF PUBLIC ROADWAYS.

COMPLIANCE IS REQUIRED BY 7 WORKING DAYS - NON-COMPLIANCE WILL RESULT IN A STOP WORK ORDER.
06/23/2010 GRADING - INTERMEDIATE Continued CONTRACTOR REQUESTED CALL BEFORE INSPECTION. LEFT CHRIS GINTER A MESSAGE AT 9:00 AM. CALL WAS NOT RETURNED. WAS ON SITE AT 10:30, NO ONE PRESENT. CONTRACTOR NEEDS TO RESHCHEDULE INSPECTION.
01/05/2010 GRADING - INTERMEDIATE Continued O STORM WATER CONCERNS, NO CONTRACTOR ON SITE, JOB HAS STARTED FOUNDATION SLAB HAS BEEN POURED. NO SITE WORK HAS STARTED