Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
12/13/2010 STORMWATER FOLLOW-UP INSP Approved
07/02/2010 STORMWATER FOLLOW-UP INSP Continued 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED PER INSPECTOR CONVERSATION W/ SITE SUPERINTENDENT.
2) ENSURE CONTROLS ARE MAINTAINED UNTIL SITE IS PAVED.
3) PROVIDE A DESIGNATED CONCRETE/MATERIALS WASH OUT ON SITE.
4) SWEEP UP TRACKING AS NEEDED.
06/28/2010 STORMWATER FOLLOW-UP INSP Violation CONTRACTOR DID NOT CALL IN A PRE-CONSTRUCTION INSPECTION FOR THERE GRADING PERMIT PROR TO THE START OF CONSTRUCTION. SITE IS 70% COMPLETED. SITE IS IN NON-COMPLIANCE WITH THERE STORM WATER PLAN AND PERMIT, NO SEDIMENT CONTROLS HAVE BEEN INSTALLED.

CORRECTION REQUIRED:
1) INSTALL APPROVED SEDIMENT CONTROLS PER YOUR STORM WATER PLAN.
2) MAINTAIN SEDIMENT CONTROLS UNTIL THE SITE IS PAVED.
3) PROVIDE A DESIGNATED CONCRETE/MATERIALS WASH OUT ON SITE.
4) PERFORM PERIODIC STORM WATER MAINTENANCE SELF INSPECTION PER YOUR PLAN AND DOCUMENT THEM.
5) SWEEP UP TRACKING OF SOIL FROM YOUR SITE OFF OF PUBLIC ROADWAYS.

COMPLIANCE IS REQUIRED BY 7 WORKING DAYS - NON-COMPLIANCE WILL RESULT IN A STOP WORK ORDER.
01/05/2010 STORMWATER FOLLOW-UP INSP Continued NO STORM WATER CONCERNS, NO CONTRACTOR ON SITE, JOB HAS STARTED FOUNDATION SLAB HAS BEEN POURED.
12/04/2009 STORMWATER FOLLOW-UP INSP Continued CALLED OUT FOR INSPECTION, NO CONTACT ON SITE, SOME CONSTRUCTION WORK BEING DONE. SITE< 1AC NO SWPPP REQUIRED. BLDG PERMIT # T08CM02512.

ALTHOUGH NO SWPPP IS REQ, CONTRACTOR MUST ENSURE DISTURBED SOIL STAYS ON SITE:
1) PROVIDE GRADING PLAN FOR INSPECTION
2) SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAYS
3) CONTAIN ANY MATERIALS USED ON SITE AND DISPOSE OFF PROPERLY.

CALL FOR RE-INSPECTION