Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T08BU01287
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/15/2010 | STORMWATER FOLLOW-UP INSP | Approved | ||
02/09/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS AT THIS TIME, CONTRACTOR PREPED FOR PAVING OF EAST PARKING AREA | |
01/27/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS AT THIS TIME. REVISED PLAN HAS BEEN APPROVED, CONTRACTOR BLDG PER PLAN. |
|
01/20/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME - SITE WILL CONT TO BE UNDER A STORM WATER PERMIT UNTIL 100% STABILIZED. NO GRADING CHANGES OR CONCERNS |
|
01/12/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS AT THIS TIME | |
12/23/2009 | STORMWATER FOLLOW-UP INSP | Continued | CHANGES TO SIDEWALK AND ACCESS RAMP ALONG NORTH SIDE OF BLDG, WILL BE SHOWN ON REVISED PLANS. NO SWPPP CONCERNS AT THIS TIME | |
11/02/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
09/30/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
09/23/2009 | STORMWATER FOLLOW-UP INSP | Continued | CHECKED SUBGRADE FOR PARKING LOT. MOST CURBING IN PLACE, CONTRACTOR WILL MOVE SEDIMENT CONTROLS TO ANY CURB OPENINGS AND WALL OPENINGS ON SITE AND PROTECT ANY CATCH BASINS. |
|
08/27/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. | |
06/30/2009 | STORMWATER FOLLOW-UP INSP | Continued | 1) MAINTAIN EXISTING SEDIMENT CONTROLS THROUGHOUT THE DURATION OF THE SITE WORK. DOCUMENT SELF INSPECTIONS AND MAINTENANCE DONE. 2) INSPECT SEDIEMNT CONTROLS AFTER ANY SIGNIFICANT RAINFALL - REPAIR IF NEEDED. 3) INSTALL A CONCRETE/MATERIALS WASH-OUT AREA WHEN APPLICABLE. 4) SWEEP UP ANY TRACKED SOIL AS NEEDED. |