Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
Permit Number - T08BU01287
Inspection Description - STORMWATER INSTALL OF CONTROLS
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/14/2009 | STORMWATER INSTALL OF CONTROLS | Approved | WADDLE HAS BEEN INSTALLED ALONG THE EAST PERIMETER OF THE SITE. MAINTAIN AND REPAIR AS NECESSARY. 1) POST A COPY OF YOUR NOI ON SITE. 2) INSTALL A DESIGNATED CONCRETE/MATERIALS WASH-OUT WHEN APPLICABLE. 3) SWEEP UP TRACKED SOIL ROUTINELY. 4) DOCUMENT ALL SWPPP SELF INSPECTIONS. MAY BE REQUIRED TO ADD SUPPLEMENTAL SEDIMENT CONTROLS AT A LATER TIME. |
|
05/12/2009 | STORMWATER INSTALL OF CONTROLS | Not ready for Inspection | SEDIMENT CONTROLS BEING INSTALLED, CONTRACTOR WILL INSTALL SEDIMENT CONTROLS ALONG EAST PERIMETER AND IN FRONT OF DRAINAGE CHANNEL. CONTRACTOR WILL USE EXISTING CURBING AS A BARRIER. CO NTRACTOR MAY BE ASKED TO ADD SUPLEMENTAL CONTROLS AT LATER DATE. 1) HAVE SEDIMENT CONTROLS INSTALLED BY FRIDAY 5/15/09. NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION. 2) ENSURE DRAINAGE CHANNEL IS PROTECTED. 3) SEDIMENT CONTROLS MAY NEED TO BE ADDED AT A LATER POINT IN CONSTRUCTION BASED ON THE SIZE OF THE AREA TO BE DISTURBED. |