Permit: T08BU01203

Parcel: 13609019D

Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Date Description Inspector Results Comments
04/22/2020 GRADING - INTERMEDIATE Approved SITE APPEARS TO HAVE BEEN CONSTRUCTED PER THE APPROVED PLANS
12/08/2011 GRADING - INTERMEDIATE Continued LOOKED THROUGH THE SITE AND DISCUSSED WHAT IS HAPPENING IN THE FUTURE WITH HOWARD. HE HAS CALLED IN THE FINAL INSPECTIONS FOR THE BUILDINGS FOR TOMORROW, BUT I HAVE ADVISED HIM THAT I WILL NOT BE ABLE TO GET TO THESE INSPECTIONS UNTIL 12/12/2011 SINCE I HAVE THE 9TH ALREAD BOOKED SOLID WITH MEETINGS. HE HAS NO ISSUES WITH THE DELAYED INSPECTION SINCE THEY ARE STILL WORKING ON THE PLANTING AT THIS TIME.
07/19/2011 GRADING - INTERMEDIATE Continued DROVE THROUGH THE SITE, THE FOLLOWING ITEMS ARE BEING WORKED ON AT THIS TIME: CONSTRUCTION OF THE BUILDINGS, MOSTLY INTERNAL AT THIS TIME, MINOR EXTERIOR WORK. GRADING OF THE ROADWAYS AND PARKING AREAS FOR SUBGRADE THROUGHOUT THE SITE, PREPARING FOR THE PLACEMENT OF THE BASE MATERIAL AND THEN PLACEMENT OF THE ASPHALTIC CONCRETE. GRADING OF THE DRAINAGEWAYS ALONG THE NORTHSIDE OF THE SITE, PREPARING FOR THE PLACEMENT OF THE SHOT CRETE. PORTIONS OF THE SHOT CRETE HAS BEEN COMPLETED ALONG THE NORTH AND WEST SIDE OF THIS SITE. INSTALLATION OF THE ROCK RIPRAP IN THE BASIN AS NEEDED. CURRENTLY THE OUTLET AREA AND AN AREA ON THE EAST SIDE OF THE BASIN BETWEEN THE INLET PIPES HAS BEEN COMPLETED WITH FILTER FABRIC AND ROCK RIPRAP.
02/07/2011 GRADING - INTERMEDIATE Continued CREW POURING CONCRETE OVER THE FIBER OPTICS LINES ON THE SOUTH SIDE OF THE PROJECT, AND ON THE STRUCTURALMEMBERS OF THE EASTERN BLDG. STILL NO DECISIONS ON THE HEADER WALL FOR THE RETENTION/DETENTION BASIN FROM THE ENGINEER OF RECORD, PRELIMINARY GIVEN BUT NOT APPROVED.