Inspection Status: Partial Approval
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T08BU01201
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Partial Approval
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/04/2011 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AS PREVIOUSLY NOTED. | |
12/04/2009 | STORMWATER FOLLOW-UP INSP | Approved | NO CONCERNS AS PREVIOUSLY NOTED, SITE IS NOT COMPLETE AT THIS TIME, TWO PADS REMAIN OPEN. | |
07/30/2009 | STORMWATER FOLLOW-UP INSP | Approved | THERE ARE NO APPARENT CONCERNS AT THIS TIME, ALL CONTROLS HAVE BEEN REMOVED. | |
07/28/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | THE SITE WAS CHECKED AND MOST OF THE GRADING WORK HAS BEEN COMPLETED AT THIS TIME. THIS SITE WILL BE RECHECKED NEXT WEEK TO SEE IF THEY ARE READY FOR THE FINAL INSPECTION OF THE GRADING PERMIT. CURRENTLY THE CONTRACTOR IS WORKING ON THE PLACEMENT OF THE DECOMPOSED GRANTED IN ALL AREAS THAT HAVE BEEN DISTURBED. THE STATUS OF THIS INSPECTION WILL NOT CHENGE UNTIL ALL OF THE EXTERIOR WORK IS COMPLETE AND THE SITE IS FINALED. | |
07/09/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME, CONTRACTOR HAS BEEN ADVISED TO DO SOME GENERAL CLEAN-UP OF THE SITE AND REPLACE DAMAGED STORM WATER MATERIALS. | |
06/01/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | LOOKED OVER THE SITE TO SEE WHAT TYPE OF WORK IS HAPPENING AND WHEN IT CAN BE INSPECTED FOR COMPLETION. CURRENTLY THE DEVELOPER IS WORKING ON THE SOUTHERN BUILDING OF THE SITE AND IN THE PARKING AREA, ANTICIPATING OPENING THE CURRENT BLDG IN JULY. THERE APPEARS TO BE NO CONCERNS AT THIS TIME FOR THE STORMWATER ITEMS. | |
03/26/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
02/24/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
02/17/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS | |
01/20/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | SPOKE TO CINDY WITH CDG REGARDING SWPPP THIS IS A LEED PROJECT AND CHANGES MAY BE MADE TO THE PLAN-IE WATTLE MAY BE XCHGD FOR V-DITCH |