Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/23/2009 | STORMWATER INSTALL OF CONTROLS | Approved | ||
| 02/04/2009 | STORMWATER INSTALL OF CONTROLS | Cancelled | INSPECTION CANCELED UNTIL THE AZPDES AUTHORIZATION IS RECEIVED. | |
| 02/03/2009 | STORMWATER INSTALL OF CONTROLS | Correction Required | 1. TWO LOTS ON THE WEST END OF THE PROJECT HAVE BEEN FENCED IN AND A EARTHEN BERM HAS BEEN PLACED AROUND THIS PORTION OF THE SITE. THE EARTHEN BERM HAS NOT BEEN COMPACTED, BUT THE BERM SHOULD PROVIDE SUFFICIENT CONTROL WHERE IT IS AGAINST THE FENCE. 2. THE BERM AT THE WASHOUT AREA NEEDS TO BE COMPACTED. 3. THE BERM AT THE BASE OF THE STOCKPILE (LESS THAN 6' HEIGHT) PROVIDES SOME CONTROL HOWEVER A V-DITCH 6-8" DEEP AROUND THE STOCKPILE WILL PROVIDE BETTER CONTROL. V-DITCH SHOULD HAVE A RELEASE POINT NEAR THE STABILIZED CONSTRUCTION ENTRANCE. 4. 3" RIVER ROCK ON THE STABILIZED CONSTRUCTION ENTRANCE IS IN PLACE. |