Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/23/2009 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
| 02/04/2009 | ENGINEERING PRE-CONSTRUCTION | Cancelled | INSPECTION CANCELED UNTIL THE AZPDES AUTHORIZATION IS RECEIVED. | |
| 02/03/2009 | ENGINEERING PRE-CONSTRUCTION | Correction Required | NO ONE ON SITE, CALLED CONTRACTOR, SAID HE FORGOT TO CALL AND CANCEL THE INSPECTION. HE IS WAITING TO RECEIVE THE AZPDES AUTHORIZATION. HE WILL RESCHEDULE ONCE THE AUTHORIZATION IS IN HAND. | |
| 01/07/2009 | ENGINEERING PRE-CONSTRUCTION | Correction Required | 1. POST THE GRADING PERMIT AND AZPDES AUTHORIZATION. 2. PROVIDE SWPPP AND GRADING PLANS ON SITE. 3. REVIEW THE SWPPP AND PRE-CONSTRUCTION FORM DOCUMENTS, FILL IN ALL BLANKS AND SUBMIT TO INSPECTOR AT FOLLOW-UP INSPECTION. 4. INSTALL BMP CONTROLS PER THE SWPP PLAN. 5. UPDATE SWPPP AS NEEDED. 6. CALLL FOR RE-INSPECTIONS, INSPECTIONS 09150 AND 09152 |