Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 01/07/2009 |
FIRE SPKLR - FINAL |
|
Approved |
|
| 10/13/2008 |
FIRE SPKLR - FINAL |
|
Partial Approval |
Temp C of O approved. Sprinkler heads shall be 1" below drop ceiling for proper operation, this will stop final C of O if all heads are not adjusted when final is called in. |
| 10/07/2008 |
FIRE SPKLR - FINAL |
|
Not ready for Inspection |
Sprinkler heads are to far up into the drop ceiling sprinkler defectors shall be hanging down in the clear for proper operations. Shall check throughout the business. |