Permit: T08BU00906

Parcel: 11105063J

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
02/19/2009 STORMWATER FOLLOW-UP INSP Approved
01/28/2009 STORMWATER FOLLOW-UP INSP Partial Approval NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
01/26/2009 STORMWATER FOLLOW-UP INSP Continued RAINING, NO ACTIVITY ON SITE WILL RE-SCHEDULE
01/06/2009 STORMWATER FOLLOW-UP INSP Correction Required ENSURE YOU COMPLY WITH YOUR SWPPP UNTIL THE SITE IS 100% STABILIZED.
1) STABILIZED CONSTR ENTRANCE
2) MAINTAIN SEDIMENT CONTROLS
3) SWEEP UP TRACKED SOIL
4) POST YOUR AZPDES AUTHORIZATION NUMBER
5) DOCUMENT SELF INSPECTIONS
11/12/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
09/19/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
NO EVIDENCE OF SOIL DISCHARGE, OR TRACKING. CONTINUE TO PERFORM SW MAINT SELF INSPECTIONS.
08/06/2008 STORMWATER FOLLOW-UP INSP Correction Required 1) INSTALL CONCRETE WASH-OUT WHEN APPLICABLE.
2) PERFORM AND DOCUMENT STORMWATER SELF INSPECTIONS PER YOUR PLAN.
3) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION.
4) SWEEP UP TRACKING.

CALL FOR ANY QUESTIONS OR COMMENTS.