Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2009 | FIRE SPKLR - FINAL | Approved | TESTED ALL FLOW AND TAMPERS TESTED FIRE PUMPS TESTED DRY PIPE TRIP FOR PATIO TESTED PREACTION SYSTEM FOR COMPUTER ROOM ALL TESTING PASSED. Gauges on all risers are piped together with ΒΌ" pipe this used for pressure relief valve for gridded system. Approved by David Mann. |
|
| 12/16/2008 | FIRE SPKLR - FINAL | Cancelled | ||
| 08/20/2008 | FIRE SPKLR - FINAL | Partial Approval | Office areas visually inspected. OK for temp C of O. |