Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2008 | ENGINEERING PRE-CONSTRUCTION | Approved | Completed precon with Les site super (331-5976) | |
| 07/29/2008 | ENGINEERING PRE-CONSTRUCTION | Correction Required | Spoke to Les site super on site. Contractor needs to call in inspections and clean washout from site. If not called in by 8/01/08 will issued notice of violation. | |
| 07/17/2008 | ENGINEERING PRE-CONSTRUCTION | Correction Required | Issued correction notice. Contractor has 3 days to address: 1- Install SWPPP controls on north and est side of project. 2- Clean all concrete wash out around site. 3- Provide wash out area for sub-contractors. 4- Schedule engineering per-con. If items are not addressed I will issue a notice of violation. Spoke to Les site super in regards to. |