Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T08BU00687
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/30/2009 | GRADING - FINAL | Approved | Basin has been recontructed for positive drainage and inspected for acceptance. | |
01/23/2009 | GRADING - FINAL | Partial Approval | Met on site with owner and builder to address basin holding water longer then 24 hours. Contractor to submit revised drawing show new bleed pipe. | |
01/21/2009 | GRADING - FINAL | Correction Required | Spoke to Peter (240-5036) in regards to basin holding water longer then 24 hours. to meet with engineer on site to discuss options. | |
01/08/2009 | GRADING - FINAL | Correction Required | Issued Correction Notice, contractor needs to address basin holding water longer then 24 hours. Pictures taken. Spoke to Danny site super in regards to. Contractor has 30 days to address issue. If note addressed will issue Notice of Violation. | |
11/07/2008 | GRADING - FINAL | Partial Approval | Contractor needs to: 1- Remove all SWPPP controls. 2- Install gates on trash enclosure. 3- Provide site cert. from engineer, per C.O.T. D.M. chapter XIV, section 14.2(7). 4- Stabilize all areas disturbed by construction. 5- Rip Rap all drainage channels per approved detail 7. 6- Engineer needs to address exposed rebar northwest corner. (safety) 7- Provide approved drawings for inspection. 8- Complete H.C. access southeast corner on building lot 1. 9- Remove all construction debris and materials from site. |
|
11/07/2008 | GRADING - FINAL | Correction Required | Met with Danny on site. Contractor needs to: 1- Remove all SWPPP controls. 2- Install gates on all trash enclosures. 3- Provide site cert from engineer. 4- Stabilize all areas disturbed by construction. 5- Install rip rap channel, per approved drawings. 6- Engineer needs to address exposed rebar north west corner of project. (safety) 7- Provide approved revised drawings for inspection. |
|
10/29/2008 | GRADING - FINAL | Correction Required | Contractor can remove fence if: 1- All lots are stabilized. 2- Use traffic barrcades to areas still under construction. 3- Use asphalt for HC access to building. Spoke to Danny in regards to. |
|
10/24/2008 | GRADING - FINAL | Correction Required | Met with Danny (super) on site, walked site looking at all items needing to be completed for final. Contractor needs to call in for final. |