Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T08BU00687
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/09/2009 | GRADING - INTERMEDIATE | Approved | PER INSPECTION IN T08BU01954 - Approved DSMR # 09-14 referenced on plans for change in dimensions of Buffalo Wild Wings solid waste dumpster. See As-built approved 9JUN09. This as-built ("final grading plan") is intended to close out both T08BU00687 & T08BU01954. | |
02/04/2009 | GRADING - INTERMEDIATE | Partial Approval | Contractor graded area t stop standing water on northeast side. Engineer wants to install bleeder pipe in basin area. Will need to submit revision to EL. | |
10/17/2008 | GRADING - INTERMEDIATE | Partial Approval | Contractor placed rebar for trash enclosure pad. #4 on 12" Centers. | |
09/25/2008 | GRADING - INTERMEDIATE | Partial Approval | Met on site with Danny site super in regards to trash enclosures. OK to place concrete for footer. | |
09/22/2008 | GRADING - INTERMEDIATE | Partial Approval | Met with Danny site super in regards to Trash enclosures. Contractor needs to build per DS. Contractor work off plan that is not approved, all work at risk. | |
09/19/2008 | GRADING - INTERMEDIATE | Partial Approval | Met with Danny on site. Contractor wants to open Pad 1 for business before site is complete. I told Danny he needs to speck to EE down at 201 N. Stone. | |
09/15/2008 | GRADING - INTERMEDIATE | Partial Approval | Met on site with Danny site super. Contractor needs to maintain 24' PAALs for two way traffic. If PAALs are less then 24' contractor will need to obtain DSMR. | |
08/19/2008 | GRADING - INTERMEDIATE | Correction Required | Need to repair SWPPP controls on site and sweep existing shopping center. Provide construction entrance at all ingress/egress points. |