Permit: T08BU00687

Parcel: 11942009C


Addresses:

1350 W IRVINGTON RD


Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Permit Number - T08BU00687

Inspection Description - STORMWATER FOLLOW-UP INSP

Inspection Status - Approved

Date Description Inspector Results Comments
06/09/2009 STORMWATER FOLLOW-UP INSP Approved PER INSPECTION IN T08BU01954 - Approved DSMR # 09-14 referenced on plans for change in dimensions of Buffalo Wild Wings solid waste dumpster. See As-built approved 9JUN09. This as-built ("final grading plan") is intended to close out both T08BU00687 & T08BU01954.
09/30/2008 STORMWATER FOLLOW-UP INSP Correction Required ON SITE EVALUATION WITH ELIZABETH EBERBACH AND DAN/G&J CONST.
REVIEWED REQUIREMENTS FOR C OF O FOR BUFFALO WILD WINGS.
1. COMPLETE ALL SITE WORK OUTSIDE OF CONSTRUCTION FENCE.
2. PROVIDE CONSTRUCTION FENCE ON UN-BUILT LOTS.
3. PROVIDE ALL SWPPP BMP'S FOR UN-BUILT LOTS.
4. GRADE STOCKPILE TO MAX. HEIGHT OF 6'.
5. PROVIDE SIGNAGE PER THE TRAFFIC PLAN. RIGHT TURN ONLY SIGN NEEDED UNTIL CONSTRUCTION OF MEDIAN ISLAND ON IRVINGTON.
6. PROVIDE DSMR FOR TRASH ENCLOSURE AT SOUTHWEST CORNER OF SITE.
7. CONSTRUCT A.D.A. RAMPS WITH TRUNCATED DOMES.
8. CONSTRUCT DRAINAGE SWALE WITH ROCK CHECK DAMS ON WEST PERIMETER.
09/15/2008 STORMWATER FOLLOW-UP INSP Correction Required Contractor needs to keep existing asphalt clean of track out. Provide wash out area for sub-contractor per SWPPP.
07/24/2008 STORMWATER FOLLOW-UP INSP Correction Required Met with Danny on site. Contractor needs to:
1- Stabilize around permeter of site.
2- Re-install SWPPP controls.
3- Sweep Irvington Rd.
4- Install controls in curb cut.
5- Install construction entrance.
If contractor can not address problem he will need to re-submit SWPPP.
07/18/2008 STORMWATER FOLLOW-UP INSP Correction Required Issued correction notice. Contractor had 1 day to:
1- Install SWPPP controls for earth work along Irvington Rd.
2- Sweep driveway to shopping center.
Spoke to site super in regards to.