Permit: T08BU00605

Parcel: 12707115A


Addresses:

350 N CLOVERLAND AV

Inspection Status: Approved

Inspection History: ENGINEERING PRE-CONSTRUCTION

Date Description Inspector Results Comments
04/15/2008 ENGINEERING PRE-CONSTRUCTION Approved I MET WITH BENNY TELLEZ 975-0305
THIS SITE IS LESS THAN AN ACRE AND DOES NOT REQUIRE A SWPPP, HOWEVER, SEDIMENT AND EROSION CONTROL SHOULD BE PROVIDED TO PREVENT STORMWATER POLLUTION. MR. TELLEZ AGREED TO PROVIDE STRAW WATTLE AT THE WEST END OF THE SITE TO PREVENT SEDIMENT TRANSPORT DURING A RAIN EVENT.
THE PROJECT IS A WATER HARVESTING/DRAINAGE SWALE AND PARK.