Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2009 | ENGINEERING PRE-CONSTRUCTION | Approved | AP | |
| 07/03/2008 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | LFT MSG FOR BOB MOLLORY TO CALL REGARDING PRECON YESTERDAY DROVE BY SITE |
|
| 06/26/2008 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | TALKED TO BOB MALLORY REGARDING THIS SITE PRECON MUST BE CALLED IN AND BMPS IN PLACE BEFORE ANY WORK INCLUDING GRUBBING IS STARTED |