Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
Permit Number - T08BU00446
Inspection Description - GRADING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/21/2009 | GRADING - FINAL | Approved | ||
05/20/2009 | GRADING - FINAL | Cancelled | IVRS - RI canceled | |
01/07/2009 | GRADING - FINAL | Denied | Contractor needs to; 1- Temp sidewalk needs to be H.C. accessible. Slope 10%, no truncated domes. See note 35 sheet C1-02. 2- Contractor needs to have engineer certify site. Per note 20, sheet C1-02. 3- Engineer needs tgo address PAAL widths. (22.4) 4- Address sidewalk slope southeast corner of building. more then 5%. See note 35, sheet C1.02 5- Remove all construction debris, trailer and materials from site. 6- Stabilize all areas. 7- Install class II bike parking with in 50' of front door. Per D.S. 2-09. 8- Install all class I bike parking, per approved drawings. (4) 9- Backfill behind curb and next to sidewalk northeast corner. 10- Address cross walk south east corner more then 5%. See note 35, sheet C1-02. met with Donny on site. |
|
10/17/2008 | GRADING - FINAL | Correction Required | Met with Jerry on site. Contractor needs to maintain 5% slope and 2% cross slope for walk ways. | |
08/29/2008 | GRADING - FINAL | Partial Approval | Spoke to Tim project manager in regards to temp sidewalk and trash enclosures. Temp side walk called out on approved grading plan (see note 15) Trash enclosures will need to be move to stop from protruding into roadway. Also spoke to Jerry in regards to both items. Contractor needs to obtain copy of approved grading plan and keep on site durning construction. | |
06/20/2008 | GRADING - FINAL | Denied | Complete all work. Spoke to Clint with Borderland in regards to. |