Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date |
Description |
Inspector |
Results |
Comments |
| 07/07/2009 |
STORMWATER FOLLOW-UP INSP |
|
Approved |
DRIVEWAY PAVING COMPLETE SOUTH OF GYM |
| 07/01/2009 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
IT APPEARS THAT THE SITE IS STABLE AT THIS TIME EXCEPT FOR THE PORTION OF THE ROADWAY THAT HAS NOT BEEN CONSTRUCED. THIS PORTION OF THE WORK WILL BE COMPLETED ON 7/3/09 AND WILL BE RECHECKED AT THAT TIME. |