Permit: T08BU00372

Parcel: 118050010

Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Date Description Inspector Results Comments
09/30/2009 GRADING - INTERMEDIATE Approved
01/26/2009 GRADING - INTERMEDIATE Partial Approval Roof conections to stormsewer OK.
12/05/2008 GRADING - INTERMEDIATE Partial Approval Contractor removing old storm sewer piping. New line in operation.
11/13/2008 GRADING - INTERMEDIATE Partial Approval Contractor continues to backfill for new gym.
11/05/2008 GRADING - INTERMEDIATE Partial Approval Observed backfill of retaining wall on east side of project at track. Weep holes have gravel and filter fabric. Compaction effort OK.
09/26/2008 GRADING - INTERMEDIATE Partial Approval Looked at stormwater piping soth side of new building. Trenching per D.S.
09/19/2008 GRADING - INTERMEDIATE Partial Approval Contractor completeing roof tie in north side of new building.
09/02/2008 GRADING - INTERMEDIATE Partial Approval Set up meeting on site with AL site super, to pick up pictures and look at stormwater pipe installation. All needed to re-schedule.
05/30/2008 GRADING - INTERMEDIATE Partial Approval Contractor installed PVC pipe from southeast corner running west. Flow in correct direction. Spoke to Todd and Alan in regards to.