Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: T08BU00315

Parcel: 135074470


Addresses:

1450 S EASTSIDE LP

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
06/26/2008 STORMWATER FOLLOW-UP INSP Approved FINAL PERMIT
06/09/2008 STORMWATER FOLLOW-UP INSP Partial Approval NO CHANGE IN SITE
06/05/2008 STORMWATER FOLLOW-UP INSP Partial Approval ROADWAY HAS BEEN SWEPT
TRENCH ALONG EAST SIDE OF SITE
ROCK/GRAVEL HAS BEEN PLACED
06/04/2008 STORMWATER FOLLOW-UP INSP Correction Required CALLED MIKE WITH BATES PAVING AT 240-2055 TO ADVISE STREET NEEDS TO BE SWEPT