Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/17/2008 | STORMWATER FOLLOW-UP INSP | Approved | All areas stabilized. | |
| 09/15/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued correction notice. Contractor needs to: 1- Sweep all frontage streets. Contractor has 2 days to complete. If item not complete will issue a notice of violation. Spoke to Roger site owner. |
|
| 05/22/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | Met on site with super, went over placement of construction entrance to stop track out. |