Inspection History: GRADING - INTERMEDIATE
Permit Number - T08BU00244
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2010 | GRADING - INTERMEDIATE | Approved | AWAITING PUNCHLIST ITEM COMPLETEION FOR FINAL GRADING APPROVAL | |
| 12/01/2009 | GRADING - INTERMEDIATE | Continued | MET OUT ON-SITE WITH THE DEVELOPER TO LOOK AT SOME OF THE ISSUES THAT THEY ARE CURRENTLY FACED WITH. 1) THEY HAVE RAISED QUESTIONS WITH THE SIDEWALK THAT RUNS FROM THE SOUTHWEST CORNER OF THE BUILDING OUT TO CAMINO SECO BLVD. 2) CHANGING THE DIRECTION OF A DRAINAGE SWALE FROM THE NORTHWEST PARKING LOT TO A DRAINPIPE GOING UNDERNEATH CAMINO SECO. 3) PARKING PLANTERS WITHIN ALL PARKING LOTS ARE NOT DESIGN ADEQUATELY. THESE AREAS HAVE BEEN DESIGNED WITHOUT RECESSED CURBS TO HELP PROTECT THE PAVEMENT FROM FUTURE DAMAGE. |
|
| 11/30/2009 | GRADING - INTERMEDIATE | Continued | THE SITE INSPECTION WAS REQUESTED TO VERIFY IF SOME OF THE MODIFICATIONS OF THE WEST SIDE WILL REQUIRE APPROVALS BY THE ENGINEERING AND ZONING REVIEWERS PRIOR TO SUBMITTING AS-BUILT DRAWINGS. I WILL CHECK WITH THE REVIEW STAFF ON THE AREAS THAT HAVE BEEN REQUESTED TO BE CHANGED AND WILL NOTIFY THE CONTRACTOR OF WHAT WILL BE REQUIRED OF HIM PRIOR TO THE FINAL INSPECTION FOR THE C OF O. | |
| 10/15/2009 | GRADING - INTERMEDIATE | Continued | SEE COMMENTS FROM PREVIOUS INSPECTIONS IN REGARDS TO A PARTIAL LIST OF REMAINING ITEMS AT THIS TIME. THIS SITE IS CURRENTLY UNDER CONSTRUCTION AT THIS TIME TO INSPECT IT FOR A FINAL CLEARANCE OF THE GRADING OR THE BUILDING. I DISCUSSED WITH THE CONTRACTOR THE REQUIREMENTS FOR THE DRAINAGE OF THE ROOF DRAINS LOCATED ON THE NORTHSIDE OF THE NEW STRUCTURE AND HOW THEY MUST PASS UNDERNEATH THE SIDEWALKS AND CAN NOT DEPOSIT MATERIAL DIRECTLY ONTO THE SIDEWALKS. HE WILL BE WORKING ON THIS ITEM IN THE FUTURE MAKING CHANGES AS NEEDED TO ENSURE THAT ALL WATER IS DEPOSITED PER THE CITY OF TUCSON STANDARDS AND SPECIFICATIONS. | |
| 10/08/2009 | GRADING - INTERMEDIATE | Continued | CHANGE TO HC RAMP AT NEW ACCES POINT FROM HC PARKING SPACES. RAMP WILL PROTRUDE OUT FROM CURB INTO A HATCHED AREA FOR PEDESTRIANS INSTEAD OF RAMPING INTO SIDEWALK AREA. NEED MEMO FROM EOR. | |
| 10/07/2009 | GRADING - INTERMEDIATE | Revision | CONTRACTOR PROVIDE A REVISED PLAN SHOWING A CHANGE IN LOCATION OF 13 HC PARKING SPACES - SHIFT SPACES TO THE SOUTH TO MEET CROSS SLOPE STD OF NO >1:48. | |
| 09/29/2009 | GRADING - INTERMEDIATE | Continued | PROVIDE A STATEMENT FROM THE ENG/ARCH ON MOVING OF THE HC PARKING SPACES TO MEET ANSI/ADAAG SLOPE REQUIREMENTS. SOME PARKING SPACE WILL BE MOVED FURTHER FROM THE CHURCH ENTRANCE IN ORDER TO MEET THE NO >2% CROSS SLOPE STD. | |
| 09/10/2009 | GRADING - INTERMEDIATE | Continued | DISCUSSED ALTERNATE SOLUTION TO HC PARKING AND SLOPE CONCERNS. CONTRACTOR WILL RE-GRADE HC PARKING AND ACCESS AREA. | |
| 08/13/2009 | GRADING - INTERMEDIATE | Continued | CORRECTION REQUIRED: 1) PROVIDE A 15' VEHICULAR ACCESS RAMP FOR MAINTENANCE FOR EACH RET/DET BASIN ON SITE, PER CITY OF TUCSON DEVELOPMENT STANDARD #10-01.0. 2) PROVIDE A 42" HIGH SECURITY BARRIER FOR RET/DET BASINS ON SITE ( COT STD DETAIL # 105). COT DEV STD # 10 - 01.0 REQUIRES A SECURITY BARRIER AT THE TOP OF ALL BASIN SLOPES STEEPER THAN 4:1, WHERE WATER DEPTHS EXCEED 2'. 3) PER ANSI AND ADAAG REQUIREMENTS FOR ACCESSIBILITY, PARKING SPACES AND ACCESS AISLES MUST HAVE SURFACE SLOPES NOT STEEPER THAN 1:48 (2%), AND ACCESSIBLE ROUTES TO THE BLDG MUST HAVE A RUN SLOPE NO STEEPER THAN 1:20 (5%) AND A CROSS SLOPE NO STEEPER THAN 1:48 (2%). YOUR HC PARKING AND ACCESS ON THE SOUTH SIDE OF THE NEW BLDG DOES NOT MEET THE ABOVE REQUIREMENTS. 4) PER COT DEV STD # 2-08.0, WITH IN A DEVELOPMENT A CONTINUOUS PEDESTRIAN CIRCULATION PATH MUST BE PROVIDED FROM THE RIGHT OF WAY TO THE BLDG, THIS PATHWAY MUST MEET ALL ADA/ANSI REQUIRMENTS. 5) PER COT DEV STD #2-08.0 ALL SIDEWALKS MUST BE FLOOD FREE TO INCLUDE ROOF DOWNSPOUT DRAINAGE. ALL ROOF DOWN SPOUTS MUST BE ROUTED UNDER ANY ADJACENT SIDEWALKS. 6) PRIOR TO FINAL GRADING APPROVAL BY ENGINEERING, PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECORD STATING THAT ALL RET/DET BASINS AND STORM DRANAGEWAYS WERE CONSTRUCTED PER THE APPROVED GRADING PLANS. |
|
| 08/12/2009 | GRADING - INTERMEDIATE | Continued | NO CHANGES ON HC ACCESS CONCERNS OR RET/DET BASIN WEIR ISSUES. PONDING AREA IN PARKING LOT ALONG SOUTH SIDE NEAR SPEEDWAY. SEE INSPECTION COMMENT FROM 5/21/09. | |
| 05/21/2009 | GRADING - INTERMEDIATE | Correction Required | 1) PER ANSI AND ADAAG REQUIREMENTS FOR ACCESSIBILITY, PARKING SPACES AND ACCESS AISLES MUST HAVE SURFACE SLOPES NOT STEEPER THAN 1:48 (2%). AN ACCESSIBLE ROUTE MUST HAVE A RUN SLOPE NO STEEPER THAN 1:20 (5%) AND A CROSS SLOPE NO STEEPER THAN 1:48 (2%). YOUR HC PARKING AND ACCESS ON THE SOUTH SIDE OF THE NEW BLDG DOES NOT MEET THE ABOVE REQUIREMENTS. 2) VERIFY ELEVATIONS OF THE RET/DET BASIN OUTLET WEIR AND INLET TO BASIN. WEIR ELEVATION APPEARS T BE HIGHER THAT INLET TO RET/DET BASIN ALONG NE CORNER OF SITE. 3) ENSURE YOU FOLLOW REQUIREMENTS STATED IN YOUR SWPPP TO STAY IN COMPLIANCE W/ YOUR AZPDES PERMIT. |
|
| 05/12/2009 | GRADING - INTERMEDIATE | Continued | MET SUPERINTENDENT ON SITE. NEED TO ADDRESS RET/DET BASIN OUTLET WEIR LOCATION AND ELEVATION. NEED TO ADDRESS ADA PARKING AND ACCESSIBILITY, SLOPES DO NOT COMPLY WITH ANSI AND ADAAG REQUIREMENTS. NEED TO ADDRESS HC ACCESS ROUTE FROM ROW TO BLDG. |
|
| 02/25/2009 | GRADING - INTERMEDIATE | Continued | INSPECTIONS CAN NOT BE COMPLETED UNTIL REVISED GRADING PLANS ARE PROVIDED. | |
| 02/10/2009 | GRADING - INTERMEDIATE | Continued | R/D BASIN IS GRADED REVISED PLANS MUST BE PROVIDED | |
| 01/20/2009 | GRADING - INTERMEDIATE | Correction Required | NO CORRECTIONS HAVE BEEN MADE TO THE R/D BASINS. | |
| 01/13/2009 | GRADING - INTERMEDIATE | Correction Required | 1. 2:1 SLOPES REQUIRE HAND PLACED ROCK RIP RAP ON FILTER FABRIC. 2. ROCK RIP RAP CONSTRUCTION IN R.O.W. REQUIRES TRANSPORTATION R.O.W PERMIT. 3. VERIFY CORRECT ELEVATIONS FOR DISCHARGE WEIRS AND BLEED PIPES. |
|
| 01/12/2009 | GRADING - INTERMEDIATE | Correction Required | R/D BASIN, SLOPES, BERMS AND OUTLET STRUCTURES DO NOT APPEAR TO BE FUNCTIONABLE. | |
| 12/08/2008 | GRADING - INTERMEDIATE | Continued | SITE WALL AT NW PERIMETER FELL DOWN AFTER RAIN LAST WEEK. WALL IS BEING RECONSTRUCTED TODAY AND TOMORROW | |
| 11/18/2008 | GRADING - INTERMEDIATE | Correction Required | CONSULT WITH THE ENGINEER FOR CLARIFICATION REGARDING: 1. SPECIFIC LOCATION OF 8' WIDE WEIR CREST FOR BASIN "A" 2. 15% GRADE FOR BASIN "A" ACCESS RAMP. 3. DRAINAGE INLET CURB OPENINGS AND ROCK RIP RAP ON REQUIRED FILTER FABRIC. 4. DRAINAGE INLET CURB OPENINGS VS. BASIN MAINTANENCE ACCESS RAMPS. VERIFY THAT THE ACCESS RAMPS MUST HAVE A 15% SLOPE AND THE DRAINAGE INLETS ARE AT 33.3 % SLOPE. 5. VERIFY 10' WIDE CURB OPENINGS DIMENSIONS AND CURB HEIGHT TRANSITIONS. 6. PROVIDE REVISED GRADING PLAN SHOWING REVISIONS TO SITE WORK, SIDEWALKS AND PARKING. 7. PAVEMENT WIDTHS WILL BE MEASURED AT FACE OF CURB. VERIFY THAT PAVEMENT WIDTHS ARE MEASURED AT ASPHALT AND NOT AT BACK OF CURB. |
|
| 10/22/2008 | GRADING - INTERMEDIATE | Continued | TRENCHING FOR SITE LIGHTING IS IN PROGRESS. SITE IS CLOSE TO BLUE TOP |
|
| 10/15/2008 | GRADING - INTERMEDIATE | Partial Approval | NORTHWALL OF CHURCH SHOULD BE COMPLETE THIS WEEK |