Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T08BU00244
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2010 | STORMWATER FOLLOW-UP INSP | Approved | ALL SITE WORK COMPLETED, SITE IS STABILIZED | |
| 01/14/2010 | STORMWATER FOLLOW-UP INSP | Continued | 1) PROVIDE AN APPROVED SITE/GRADING PLAN FOR INSPECTION THAT SHOWS WHAT WAS BUILT. 2) COMPLETE ALL SITE WORK PER THE APPROVED PLAN. 3) PROVIDE A STORM WATER DRAINAGE/RET-DET BASIN CERTIFICATION STATEMENT FROM THE ENG OF RECORD. 4) NO SIGNIFICANT STORMWATER CONCERNS AT THIS TIME |
|
| 01/12/2010 | STORMWATER FOLLOW-UP INSP | Continued | AWAITING FINAL INSPECTION, NO STORM WATER CONCERNS AT THIS TIME | |
| 10/07/2009 | STORMWATER FOLLOW-UP INSP | Continued | 1) CONTRACTOR PROVIDE A REVISED PLAN SHOWING A CHANGE IN LOCATION OF 13 HC PARKING SPACES - SHIFT SPACES TO THE SOUTH TO MEET CROSS SLOPE STD OF NO >1:48. 2) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
|
| 08/12/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS AT THIS TIME. ENSURE ALL CATCH BASINS AND ALL TEMPORARY SEDIMENT CONTROLS ARE REMOVED PRIOR TO FINAL. | |
| 07/21/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME SWPPP IS IMPLEMENTED BY SUB-CONTRACTOR (EPAC LLC) 425-0920 |
|
| 05/12/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS AT THIS TIME, ALL DRAINAGE OUTLET POINTS ARE PROTECTED, THE REST OF THE SITE IS PAVED. | |
| 02/25/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | A LARGE PIECE OF CONCRETE IN DRAINAGE WAY EAST OF SITE WALL STILL REQUIRES REMOVAL. | |
| 02/18/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | SIGNIFICANT PROGRESS HAS BEEN MADE TO BELAY N.O.V. REMAINING CORRECTIONS SHOULD BE COMPLETED BY NEXT WEDNESDAY. JAY KNOLL (EPAC LLC) NOW THE SWPPP OPERATOR AT THIS SITE. PREVIOUS ITEMS 3,4,5 & 6 NEED TO BE COMPLETED. |
|
| 02/10/2009 | STORMWATER FOLLOW-UP INSP | Continued | ITEMS 1 AND 2 OF PREVIOUS PUNCH LIST HAVE BEEN COMPLETED. | |
| 02/03/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | ISSUED CORRECTION ORDER FOR COMPLIANCE WITHIN 7 DAYS NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION. 1. REMOVE ALL EXCESS SOIL FROM RETENTION BASINS. 2. PROVIDE ROCK RIP RAP OUTLET PROTECTION AT R/D BASIN OUTFALLS. 3. BACKFILL PERIMETER WALL FOOTING AND STABILIZE. 4. REMOVE DISCARDED CONCRETE FROM DRAINAGE (WASH) AT EAST PERIMETER. 5. REMOVE ALL SEDIMENT DICHARGED TO WASH AND STREET FROM N.E. CORNER OF SITE. 6. STAKE ALL STRAW WATTLE AT EVERY 6' IN LENGTH 7. PROVIDE COPIES OF SWPPP INSPECTION REPORTS. |
|
| 01/27/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTIONS SHOULD BE COMPLETED BY TOMORROW 1/28/09 | |
| 01/12/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. PROVIDE STRAW WATTLE AT N.E. CORNER OF SITE AT DISCHARGE POINT. 2. CLEAN UP SEDIMENT N.E. OF SITE AND IN PUBLIC ROADWAY NORTH OF SITE. |
|
| 12/08/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | STRAW WATTLE WILL BE PLACED AT NW CORNER WHEN THE WALL CONSTRUCTION IS COMPLETED TODAY OR TOMORROW. | |
| 11/18/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. RELOCATE 30' X 50' STABILIZED CONSTRUCTION ENTRANCE 2. SWEEP TRACK OUT SOIL FROM SPEEDWAY. 3. COMPLETE SITE WALL AT NORTHEAST CORNER OF SITE. 4. PROVIDE STRAW WATTLE AROUND DIRT SPOIL AT N.E CORNER OF SITE. |
|
| 10/22/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 10/15/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | SUFFICIENT PROGRESS HAS BEEN MADE TO DELAY ENFORCEMENT ACTION. 1. PROVIDE SUBSTANTIAL BMP's AT N.E. CORNER OF SITE. 2. PROVIDE SWPPP CONTROLS AROUND STOCKPILE AND KNOCK DOWN TO 6' MAXIMUM HEIGHT. |
|
| 10/10/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | PHONE CONVERSATION WITH RANDY 419-4966 REGARDING THE CORRECTION NOTICE AND SCHEDULED RE-INSPECTION FOR WEDNESDAY OCTOBER 15, 2008. EAST PERIMETER TO MATCH EXISTING GRADE 2' INSIDE PROPERTY. SWPPP CONTROLS MUST BE MAINTAINED AT THE PROPERTY PERIMETER. |
|
| 10/09/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE ISSUED FOR 7 DAY COMPLIANCE OR STOP WORK ORDER, NOTICE OF VIOLATION AND CITATIONS WILL BE ISSUED. 1. RE-INSTALL SWPPP AT PERIMETER OF SITE. 2. REMOVE ALL LOOSE SPOIL TO EXISTING GRADE AT EAST PERIMETER. 3. PROVIDE SWPPP AROUND STOCKPILES AND GRADE NO HIGHER THAT 6' MAXIMUM. 4. REMOVE MATERIALS AND STOCKPILES FROM DRAINAGE AT SOUTHWEST AREA OF SITE. CONTRACTOR NOT ON SITE, CORRECTION NOTICE WAS LEFT IN THE CONSTUCTION TRAILER OFFICE. |