Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2008 | STORMWATER INSTALL OF CONTROLS | Approved | STORMWATER CONTROLS IN PLACE | |
| 09/02/2008 | STORMWATER INSTALL OF CONTROLS | Denied | 7 DAY CORRECTION NOTICE COMPLETE THE FOLLOWING OR A STOP WORK ORDER WILL BE ISSUED. 1. PROVIDE AN AZPDES AUTHORIZATION. 2. PROVIDE SWPPP DOCUMENTS ON SITE. 3. COMPLETE INSTALLATION OF SWPP SEDIMENT AND EROSION CONTROLS. 4. REVIEW THE PRE-CON FORM AND SUBMIT A COPY TO THE INSPECTOR. 5. CLEAN UP SEDIMENT THAT FLOWED OFF-SITE DURING THE WEEKEND RAINFALL EVENTS. |