Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2008 | ENGINEERING PRE-CONSTRUCTION | Approved | REVIEWED AND SIGNED PRE-CON DOCUMENTS | |
| 09/02/2008 | ENGINEERING PRE-CONSTRUCTION | Correction Required | 7 DAY CORRECTION NOTICE COMPLETE THE FOLLOWING OR A STOP WORK ORDER WILL BE ISSUED. 1. PROVIDE AN AZPDES AUTHORIZATION. 2. PROVIDE SWPPP DOCUMENTS ON SITE. 3. COMPLETE INSTALLATION OF SWPP SEDIMENT AND EROSION CONTROLS. 4. REVIEW THE PRE-CON FORM AND SUBMIT A COPY TO THE INSPECTOR. 5. CLEAN UP SEDIMENT THAT FLOWED OFF-SITE DURING THE WEEKEND RAINFALL EVENTS. |
|
| 08/28/2008 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | 1. REVIEW PRE-CON FROM, COPY AND SUBMIT TO INSPECTOR. 2. POST AZPDES AUTHORIZATION 3. PROVIDE A COPY OF THE SWPPP DOCUMENTS. 4. INSTALL SWPPP CONTROLS. 5. UPDATE THE SWPPP 6. EXCAVATE R/D BASINS. |