Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T08BU00171
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/12/2014 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 08/24/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
| 10/25/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
| 04/19/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. SITE WILL BE CHECKED FOR THE FINAL GRADING ON 4/20-21/2010 AND COMMENTS WILL BE MADE ACCORDINGLY. CONTACTED SCOTT 480-280-9855 AND THEN MET HIM ONSITE TO LOOK OVER THE PLANS THAT HAVE BEEN APPROVED. I WILL PICK UP A COPY OF THE PLANS FROM OUR OFFICE AND WILL UTILIZE THEM IN THE FUTURE INSPECTIONS. | |
| 03/04/2010 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
| 01/26/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to address mud hole southeast corner. Tracking out on to 6th. Ave. | |
| 10/31/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor did not address Correction Notice from 10/24/08. Issued new Correction Notice today contractor has 2 days to address items. If not addressed will issue Notice of Violation. Spoke to Scott site super in regards to. | |
| 10/24/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued Correction Notice. Contractor has 7 days to address: 1- Install construction entrance. (Per SWPPP) 2- Stake down all wattle per design. 3- Clean all wash out from site. 4- Provide wash out area for sub-contractors and ensure use. 5- Contractor stockpilling more then 50 cubic yards of material, need to obtain stockpiling permit. 6- Sweep all track out into public parking area. 7- Contain all areas disturbed by construction with SWPPP controls. 8- Keep all construction activity and material separated from public access. If contractor does not address items will issue a Notice of Violation or Stop Work Order. Spoke to Scott site super. |
|
| 10/23/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to address all wash out on site and clean track out. | |
| 08/28/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to install all controls per design. |