Inspection History Details
Permit: T08BU00139
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/30/2008 | STORMWATER INSTALL OF CONTROLS | Approved | 1) CONTINUE TO SWEEP UP TRACKED SOIL OFF OF PARKING AREA AND PUBLIC ROADWAYS DAILY. 2) ENSURE A DESIGNATED CONCRETE/MATERIALS WASH OUT IS INSTALLED AND USED AND WASTE IS DISPOSED OF PROPERLY. 3) POST A COPY OF YOUR NOI ON SITE. 4) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP AND DOCUMENT THEM. 5) SHOW ANY CHANGES TO YOUR APPROVED SWPPP ON THE SWPPP DRAWING. |