Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date |
Description |
Inspector |
Results |
Comments |
| 10/28/2009 |
STORMWATER FOLLOW-UP INSP |
|
Approved |
Approved |
| 08/27/2009 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
All landscaping in place and site is stabilized. |
| 08/06/2009 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Stromwater controls look good. |
| 07/22/2009 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
storm controls in good cond. |
| 01/12/2009 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
No SWPPP concerns at this time. |
| 12/02/2008 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Super needs to install controls around all catch basins. Asked super to call in for inspection for installation of curb work, sidewalks and trash enclosure. Explained to super if they make a lot of changes to the basin, revised drawing will be needed. |
| 08/06/2008 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Contractor placed over flow pipe for basin. Spoke to Dennis in regards to cover over pipe. Approved drawing call for 3.26 of cover. Dennis said will not be a problem to do. I reminded him all material must be stabilized before final inspection. |
| 08/05/2008 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Contractor placed and wraped south chamber and fill to top of chamber with stone. |
| 08/04/2008 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Met on site with Buddy. Contractor placed chamber sections for basin. Contractor needs to continue to install per design. |
| 07/31/2008 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Contractor dug pit for basin storage. Needs to call back when gravel is place and pipe for basin. |
| 07/22/2008 |
STORMWATER FOLLOW-UP INSP |
|
Correction Required |
Issued correction notice. Contractor needs to clean track out from site. If track out not cleaned up will issue notice of violation. Spoke to Dennis site super in regards to. |
| 07/22/2008 |
STORMWATER FOLLOW-UP INSP |
|
Partial Approval |
Contractor sweeping road 3 times a day. Contractor still needs to keep up with track out from site. |