Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2009 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 04/23/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 03/18/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 02/06/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 11/12/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 09/19/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
| 07/29/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO ACTIVITY ON SITE MOST OF THE CURBING HAS BEEN INSTALLED, NO PAVEMENT YET. |
|
| 05/21/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | RE-ESTABLISH SEDIMENT CONTROLS AROUND EXISTING CATCH BASIN UNTIL SITE IS STABILIZED. | |
| 04/17/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |