Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date |
Description |
Inspector |
Results |
Comments |
| 06/24/2008 |
STORMWATER INSTALL OF CONTROLS |
|
Approved |
CONTRACTOR INSTALLED SEDIEMNT CONTROLS PER RECOMMENDATIONS FROM LAST STORM WATER INSPECTION |
| 06/16/2008 |
STORMWATER INSTALL OF CONTROLS |
|
Correction Required |
REVIEWED SWPPP WITH SUPER. NEED TO ADD SEDIMENT CONTROLS ALONG NE AND NW CORNERS OF SITE. NEED TO MOVE OIL/FUEL STORAGE AWAY FROM DRAINAGE CHANNEL AND ADD SECONDARY CONTAINMENT. |