Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/18/2008 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 01/17/2008 | PLUMBING - GAS PRESSURE TEST | Partial Approval | IVRS - Inspection :* 1. MAKE ALL CONNECTIONS HOOK UP ALL APPLIANCES TEST ENTIRE SYSTEM. DO NOT TEST THRU APPLIANCES. 2. OK TO COVER UNDERGROUND 3. ALL VALVES TO BE AGA OR CSA APPROVED 4. FURNACE AND WATER HEATER REQUIRE SEDIMENT TRAPS 5. WATER HEATER WILL REQUIRE UPGRADES WHEN IT IS REPLACED. |
|
| 01/04/2008 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE MINIMUM 10 PSI TEST AT TIME OF INSPECTION 2. ALL FITTINGS & TOOL MARKS TO BE PRIMED THEN TAPED TO MEET 40 MIL. THICKNESS OF TAPE ON ALL UNDERGROUND FITTINGS AND TOOL MARKS 3. NEED ACCESS TO ENTIRE GAS SYSTEM NOT COMPLETE LIST |