Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/04/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* CORRECTIONS MADE OK OK FOR GAS UCC LEFT AT METER |
|
| 12/31/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. YOU ARE REQUIRED TO POST YOUR ADDRESS BEFORE INSPECTION CAN TAKE PLACE 2. REMOVE ABANDONED PIPING 3. ACCESS IS TO BE READY FOR THE INSPECTOR WHEN HE ARRIVES 4. PLAN IS TO SHOW DEVELOPED LENGTH AS WELL AS BTU CONSUMPTION. NORMALLY, YOU DO NOT REDUCE PIPE SIZE BETWEEN TEES (TRY DRAWING AN ISOMETRIC) 5. PLAN DOES NOT REPRESENT INSTALLATION. REVISE PLAN, SHOW LENGTH OF EACH SECTION. SHOW SIZE OF EACH SECTION. 6. PROVIDE PETITION OF APPEAL FOR WATER HEATER T&P RELIEF. I DID NOT SEE THE BOND BETWEEN WATER AND GAS PIPING THIS MAY NOT BE A COMPLETE LIST. |